Bauknecht BD IS 8C WBS

  • Bauknecht BD IS 8C WBS Main Image
  • Bauknecht BD IS 8C WBS detail
  • Bauknecht BD IS 8C WBS visual Coolblue 1
  • Bauknecht BD IS 8C WBS visual Coolblue 2
  • Bauknecht BD IS 8C WBS inside
  • Bauknecht BD IS 8C WBS detail
  • Bauknecht BD IS 8C WBS detail
  • Bauknecht BD IS 8C WBS right side
  • Bauknecht BD IS 8C WBS product in use
  • Bauknecht BD IS 8C WBS energy label
  • Bauknecht BD IS 8C WBS detail
Select an option

Choose your dryer

8kg load capacity

Choose the better dryer that makes less noise

Bauknecht BT 96B WB
Bauknecht Quiet Dry

Better model

Thanks to the low noise level, you're not bothered by noise and the dryer also has an extra silent cycle.

Choose your dryer

Retail price

€ 579,-

€ 547,90

including VAT, free delivery

On display

  • Be the first to know when this product is in stock