Bauknecht B WM 8A6 BC S + Bauknecht BD IS 8C WBS
- Review is 0 out of 10.
- Show all accessories
- View allBauknecht washing machines
Choose your set
A and C energy labels
Choose your set
- Be the first to know when this product is in stock
A and C energy labels
Choose your set
Product number | 978692 | |
|---|---|---|
Manufacturer code | 869991729320 | |
Brand | Bauknecht | |
Warranty | 2 years | |
Processing of your defect | At your home |
Washing machine type | Front-loading washing machine | |
|---|---|---|
Load capacity | 8 kg | |
Spinning speed | 1400RPM | |
Spinning noise level | 72 dB | |
General wash cycles | Cotton, Delicate laundry, Synthetic, Wool | |
Wash cycles specifically for | Curtains, Dark clothes, Dress shirts, Jeans, Mixed laundry, Silk, Sportswear, Stains | |
Speed class | Normal | |
Washing cycle length | 218 min | |
Residual moisture percentage | 51 % | |
Hot water supply | ||
Opening diameter | 34 cm | |
Washing preferences | Color retention, Delicate fabric, Reduces wear, Sportswear |
Add laundry during cycle | ||
|---|---|---|
Built-in WiFi | ||
Start delay | ||
End of cycle signal | ||
End of cycle signal type | Acoustic, Optical | |
Accessibility options | Audio signals, Clickable buttons, Clickable dial | |
Time remaining indicator | ||
Display | ||
Control panel language | German, Symbols | |
Drum lighting | ||
Child safety lock | ||
Product line | Adaptive Wash | |
Brand-specific functions | Bauknecht Adaptive Wash, Bauknecht HomeWhiz, Bauknecht Steam Technology, Bauknecht Steam Therapy |
Washing quality | Basic | |
|---|---|---|
Laundry-care drum | ||
Load sensor | ||
4D wash | ||
Automatic detergent feed | ||
Steam function | ||
Type of steam function | Freshen up with steam |
Energy label | A | |
|---|---|---|
Energy-saving over lifespan | 220 euros | |
Annual energy consumption | 47 kWh | |
Annual energy costs | 31,02 euros | |
Auto shut-off | ||
Annual water use | 10560 l | |
Annual water costs | 14,78 euros |
Build quality | Mid-range | |
|---|---|---|
Casing material | Metal | |
Drum material | Stainless steel | |
Interior material | Stainless steel | |
Material hinge | Metal | |
Brushless motor | ||
Propulsion type | Directly on the drum | |
Drum cleaning | ||
Balancing system | ||
Self-cleaning detergent drawer | ||
Leak protection | ||
Leak protection type | Overfill protection, Safety hose | |
Leak protection range | Safer |
Depth | 58 cm | |
|---|---|---|
Width | 60 cm | |
Height | 84,5 cm | |
Weight | 74 kg | |
Standard door direction | Left | |
Glass door | ||
Reversible door | ||
Color | White | |
Appliance placement | Freestanding | |
Detachable supply hose |
Power source | ||
|---|---|---|
Power supply type | Power grid | |
Cable length | 1,4 m | |
Minimum power supply | 2200 W |
Controls via app | ||
|---|---|---|
Controlled via Android app | ||
Controlled via Apple app | ||
Controlled via Windows app | ||
Compatible with smartphone / apps |
Product number | 970182 | |
|---|---|---|
Manufacturer code | 859991727120 | |
Brand | Bauknecht | |
Warranty | 2 years | |
Processing of your defect | At your home |
Type of dryer | Heat pump dryer | |
|---|---|---|
Condensation drain | Collection in reservoir | |
Maximum load capacity, drying | 8 kg | |
Maximum noise level | 63 dB | |
Cycle duration cotton full load | 174 min | |
Cycle duration, cotton, partial load | 108 min | |
Speed class | Normal | |
Number of programs | 15 | |
Dryer cycles | Blankets, Cotton, Dress shirts, Eco, Iron dry, Jeans, Mixed, Refresh, Short, Silk, Sportswear, Wool | |
Clean lint trap indicator | ||
Empty condenser reservoir indicator | ||
Optional condensation water drainage | ||
Laundry-care drum | ||
Drum lighting | ||
Drum rotation direction | Variable | |
Steam function | ||
Best tested |
User-friendliness | Child safety lock, Controls via app, Drum lighting, Laundry-care drum, Read information via app, Start delay, Steam function, Time remaining indicator | |
|---|---|---|
Touchscreen | ||
Display | ||
Control panel language | German, Symbols | |
Start delay | ||
End of cycle signal | ||
End of cycle signal type | Acoustic, Optical | |
Accessibility options | Clickable buttons | |
Time remaining indicator | ||
Anti-wrinkle phase | ||
Child safety lock | ||
Fragrance system | ||
Product line | PrecisionDry | |
Brand-specific functions | Bauknecht Adaptive Dry, Bauknecht IronEase, Bauknecht Precision Dry |
Energy label | C | |
|---|---|---|
Auto shut-off | ||
Energy-saving over lifespan | 200 euros | |
Annual energy consumption | 176,8 kWh | |
Annual energy costs | 53,04 euros |
Build quality | Basic | |
|---|---|---|
Condensation efficiency | 9 % | |
Drum material | Stainless steel | |
Self-cleaning condenser | ||
Anti-vibration walls | ||
Casing material | Metal | |
Brushless motor | ||
Cleaning indicators | Condenser, Lint trap | |
Material hinge | Metal |
Height | 84,6 cm | |
|---|---|---|
Width | 59,8 cm | |
Depth | 60,7 cm | |
Weight | 42 kg | |
Glass door | ||
Standard door direction | Right | |
Reversible door | ||
Color | White |
Power supply type | Power grid | |
|---|---|---|
Cable length | 1,5 m | |
Minimum power supply | 800 W |
Controls via app | ||
|---|---|---|
Controlled via Android app | ||
Controlled via Apple app | ||
Controlled via Windows app | ||
Compatible with smartphone / apps |
anything for a smile
According to our washing machine expert
Thanks to the HomeWhiz app, you can control the washing machine and dryer from anywhere.
Thanks to the Adaptive Wash technology, the washing machine learns from every wash cycle.
The dryer optimizes dryer cycles with the Adaptive Dry technology.
The washing machine doesn't have AutoDose automatic detergent dosing, so you still have to dose the detergent manually.
Without self-cleaning condenser, the dryer doesn't rinse automatically after drying.
With the set of the Bauknecht B WM 8A6 BC S + Bauknecht BD IS 8C WBS, you can wash and dry easily.
Washing machineThe Bauknecht B WM 8A6 BC S washing machine has Adaptive Wash. This allows you to adjust the wash cycles to the washing result. At the end of the cycle, you can give feedback in the HomeWhiz app. In the app, you can also control the appliance remotely. You can easily freshen up worn clothes with the SteamTherapy steam cycle of the Bauknecht washing machine. You can also remove musty odors from your fabric.
DryerThe Bauknecht BD IS 8C WBS heat pump dryer has Adaptive Dry and uses AI algorithms to optimize cycles. You have to install the HomeWhiz app on your smartphone for that. This way, the heat pump dryer learns your habits and adjusts the cycles accordingly. Precision Dry makes sure your clothes don't get too hot or shrink. The Dynamic Intelligence technology automatically adjusts the cycle duration. With the IronEase cycle, you have to iron less.
Current product
Retail price
€ 1.081,80€ 1.050,-
Retail price
€ 913,90€ 886,90